Canyon Hydro Project

Harriet

  • Location: Oregon, USA
  • Rated Output: 660 kW
  • Head: 91 feet (28 meters)
  • Turbine Design: Horizontal Francis

These photos show the powerhouse and hydroelectric equipment during the installation process. The turbine was designed and manufactured by Canyon Hydro. The generator was supplied by Canyon Hydro.

Turbine and generator installed.

Turbine and generator installed.

Harriet Project Photo Gallery

Powerhouse under construction.

Powerhouse under construction.

 Equipment installation in progress.

Equipment installation in progress.

Canyon Francis turbine during the installation process.

Canyon Francis turbine during the installation process.

The powerhouse’s exterior.

The powerhouse’s exterior.

Turbine being installed as viewed from the draft tube side.

Turbine being installed as viewed from the draft tube side.