Harriet
- Location: Oregon, USA
- Rated Output: 660 kW
- Head: 91 feet (28 meters)
- Turbine Design: Horizontal Francis
These photos show the powerhouse and hydroelectric equipment during the installation process. The turbine was designed and manufactured by Canyon Hydro. The generator was supplied by Canyon Hydro.
Turbine and generator installed.
Harriet Project Photo Gallery
Powerhouse under construction.
Equipment installation in progress.
Canyon Francis turbine during the installation process.
The powerhouse’s exterior.
Turbine being installed as viewed from the draft tube side.