Haa-ak-suuk - Canada
- Location: British Columbia, Canada
- Rated Output: 6,000 kW
- Head: 995 feet (303 meters)
- Turbine Design: Five Nozzle Vertical Pelton
These photos show the turbine installation progression and the completed equipment installation. The five nozzle vertical Pelton turbine was designed and manufactured by Canyon Hydro.
Completed turbine and generator installation.
Haa-ak-suuk Project Photo Gallery
Equipment being delivered to the project site.
Powerhouse location prepared for equipment offloading.
Turbine distributor piping sections being placed.
Canyon turbine in place.
Canyon turbine prior to secondary concrete pour.
Generator installed and concrete poured.
Installation being finalized.