This one-piece replacement runner is
3.4 meters (11.25 feet) diameter, and was machined on
Canyon's 7-axis CNC mill. Canyon engineer Mike Hansen checks
tolerances on the mounting holes to align with existing
equipment.
Canyon Hydro has the expertise and
machinery to repair, rebuild, or replace your existing
hydropower components. From individual parts to the replacement
of the entire water-to-wire package, Canyon has the ability to
deliver exactly what you need, within the dimensional constraints of
your existing
facilities.
Canyon services include:
Weld-build restoration
Replacement runners
Wicket gates, wear rings, nozzles
Full turbine machining
Onsite machining and line boring
This replacement mounting pin for a Pelton runner was
manufactured by Canyon Hydro. The pin measures about 300mm (12 inches) long.
All major turbine components can be
repaired or replaced by Canyon, including runners, nozzles,
wicket gates, and wear rings. Canyon also provides onsite
services, including precision line boring.
Three-dimensional models are created from
CAD drawings, laying the groundwork for patterns and castings.
Runner castings are tightly controlled, following rigid
specifications for alloys, chills, core assemblies, and other
requirements. Before the runner is released for final
machining and balancing, it undergoes non-destructive testing
and heat treating.
Canyon Hydro maintains an impressive array
of high capacity, precision machinery, both conventional and
CNC-controlled. We've recently doubled the capacity at our
dedicated CNC facility. Our largest CNC mill is a 7-axis machine
able to accommodate components up to 3 meters (16 feet)
diameter, 11 meters (36 feet) long, weighing up to 15 tons.
Canyon's CNC Center provides a broad
array of precision machining capabilities, including the
large-capacity CNC mill at left.
For more information about Canyon's
machining abilities, see our table of
maximum capacities.
Our goal at Canyon Hydro is to build
replacement components that deliver more power and last longer
than your originals. Please contact us
if you would like more information or a quote.
Canyon Hydro refurbished this
50MW Francis runner, shown at the project site in
California ready for installation.
Refurbished buckets for a 25MW Pelton runner in Puerto Rico.
The bucket on the pallet provides insight about the size of
the runner.
Runner rebuild for a 67MW system in
Alaska. Runner is 3
meters diameter (about 10 feet). Weight is 9,525 kilograms
(21,000 pounds).
Canyon technicians working below
the generator stator, readying the system for the
refurbished 50MW Francis runner shown above.
Learn more about...
Canyon Hydro
Turbines
Water to Wire
Packages
Turbine Inspection Services