Sutton
			Location: Vancouver Island, Canada
			Rated Output: 5,400 kW
			Head: 1,079 feet (329 meters)
			Turbine Design:  Twin nozzle Pelton 
			 
				
					Completed Canyon Hydro turbine system inside the Sutton powerhouse.
				 
				
			
			
		 
		
		
			Haga clic en cualquier imagen para ampliar
			
			
			 
			Preliminary fitting of turbine intake splitter and housing at Canyon Hydro.
			
			
			 
			Inspection of Canyon Hydro Pelton runner during the polishing phase.
			
			
			 
			Final inspection of the completed Pelton runner before packing for shipment.
			
			
			 
			Loading the components for the Sutton hydroelectric system on a flatbed for 
			shipment.
			
			
			 
			Completed Canyon Hydro turbine system inside the Sutton powerhouse.
			
			
			 
			External view of the Sutton powerhoue and substation.
			
			
			 
			Diversion and intake system for the Sutton Hydro project.
			
			
				
			© Copyright 2013 Canyon Industries, Inc.  
		Todos los derechos reservados.