La Esperanza
			Location: Honduras
			Rated Output: 12,000 kW
			Head: 1,214 feet (370 meters)
			Turbine Design:  Twin Dual-Nozzle Peltons.
			These photos offer a glimpse of the entire construction 
			process of the La Esperanza project in Honduras. The twin 
			Pelton turbines were designed and manufactured by Canyon Hydro.
			
				Setting the first Canyon Pelton runner into its housing.
			 
				
			
			
		 
		
		
			Haga clic en cualquier imagen para ampliar
			
			
			 
			Intake system under construction from below.
			
			
			 
			Intake system under construction from above.
			
			
			 
			Penstock during construction.
			
			
			 
			Penstock at bend toward powerhouse.
			
			
			 
			Preliminary assembly of of twin turbine housings during fabrication 
			at Canyon Hydro.
			
			 
			Test fitting of turbine intake bifurcation during fabrication 
			at Canyon Hydro.  Canyon vice president Richard New (left) and Shop Foreman Loren Sweitzer.
			
			
			 
			Powerhouse under construction, positioning Canyon intake bifurcation 
			and valves to feed the twin turbines.
			
			 
			Inside of powerhouse during construction, readying
			penstock for Canyon Hydro Turbine #1.
		
			
			 
			Twin Canyon Hydro turbine housings with generators in place.
			
			
			 
			Setting the first Canyon Pelton runner into its housing.
			
			
			 
			Pelton runner in place on Turbine #1.
			
			
			 
			Turbine #1 with runner in place.  Canyon Hydro
			President Dan New, center.
			
			
			 
			View of Turbine #1 from penstock.
			
			 
			Inside the completed powerhouse. Catwalk provides access to variable needle
			nozzle on one of the Canyon Hydro turbines.
			
			 
			Inside the completed La Esperanza powerhouse.  Canyon Hydro designed
			and manufactured the twin Pelton turbines, and provided generators and switchgear as part of its water-to-wire system.
			
				