El Dorado Project
			Location: British Columbia, Canada
			Rated Output: 1,100 kW
			Head: 610 feet (186 meters)
			Turbine Design:  Twin-Nozzle Pelton
			 
			
				El Dorado Pelton Turbine system, designed and manufactured by Canyon Hydro.
			 
				
			
			
		 
		
		
			Haga clic en cualquier imagen para ampliar
			
			
			 
			El Dorado Pelton Turbine system, designed and manufactured by Canyon Hydro.
			
			
			 
			El Dorado Pelton Turbine system, designed and manufactured by Canyon Hydro.
			
			
			 
			El Dorado powerhouse exterior (structure on left).
			
			
			 
			El Dorado Pelton Turbine system, designed and manufactured by Canyon Hydro.
			
			
			 
			El Dorado Pelton Turbine system, designed and manufactured by Canyon Hydro.
		
			
				
			© Copyright 2013 Canyon Industries, Inc.  
		Todos los derechos reservados.